Learning Center · Deal Analysis

How to Estimate Rehab Costs on a Flip

By FlipProperties Editorial TeamPublished October 22, 2026Updated October 22, 2026PropStream figures checked October 2026

Your repair estimate sets your offer. Underestimate it and the profit disappears; overestimate it and you lose the deal. This method helps you build an estimate you can defend: walk the property, price it line by line, get bids, and add a contingency before you make an offer.

FlipProperties is a PropStream affiliate partner. We may earn a commission if you sign up through our links, at no cost to you.

10–20%

Contingency range HUD's 203(k) program uses for older homes

1978

Homes built before this year fall under EPA lead-paint renovation rules

70%

Rule-of-thumb share of ARV, minus repairs, for a maximum offer

Sources: HUD 203(k) contingency requirements; EPA Renovation, Repair and Painting Program (checked October 22, 2026).

How to estimate rehab costs, step by step

  1. 01

    Walk the property with a checklist.

    Go room by room and outside. Note everything that needs repair or replacement, and take photos.

  2. 02

    Price each line item.

    List materials and labor for each item rather than guessing one total. Small items add up.

  3. 03

    Get contractor bids on the big items.

    Roof, HVAC, electrical, plumbing and foundation work are where estimates go wrong most often. Get more than one bid when you can.

  4. 04

    Add permits and fees.

    Check your city or county's permit requirements. Structural, electrical, plumbing and mechanical work usually needs a permit.

  5. 05

    Check the year built.

    If the home was built before 1978, paid work that disturbs paint must follow EPA lead-safe rules, which can add cost and time.

  6. 06

    Add a contingency.

    Hidden problems show up once walls open. HUD's 203(k) renovation loans require a 10% to 20% contingency reserve on homes 30 years or older, which is a useful benchmark.

  7. 07

    Plug the total into your offer.

    Subtract your repair estimate in the 70% rule, then check the result against real comps.

Room-by-room checklist

AreaWhat to check
ExteriorRoof, gutters, siding, windows, doors, driveway, drainage and landscaping.
SystemsHVAC, electrical panel and wiring, plumbing, water heater and sewer line.
StructureFoundation, framing, signs of water damage and termite damage.
InteriorKitchen, bathrooms, flooring, drywall, paint, trim and lighting.
Other costsPermits, dumpsters, cleaning, utilities during work, and staging.

How much contingency to add

There's no single right number, but a government benchmark helps. HUD's 203(k) program requires a contingency reserve of 10% to 20% of repair costs on homes 30 years or older, and at least 15% if the utilities aren't working. Older homes, unknown systems and vacant properties are good reasons to aim higher.

Free Tool

FlipProperties Repair-Cost Estimator

Enter your own cost for each item. The estimator adds them up and applies a contingency reserve.

The quick estimate's typical rates are national averages from Angi and HomeGuide, adjusted by state using the JLC 2025 Cost vs Value report's regional costs; checked November 8, 2026, next review February 8, 2027.

Step 2 of 3: Total repair costs

For when you can't walk the house yet. Repair costs vary by market and scope. Pick your state below for typical homeowner pricing as a starting point, then swap in your contractors' bids. Walk the property and switch to line items before you commit to a number.

Rehab level and your rate

Enter square footage and your rate for the selected level.

Contingency

HUD’s 203(k) program requires a 10%–20% contingency reserve on homes 30 years or older, and at least 15% if the utilities aren’t working.

Subtotal (quick estimate)
$0
Contingency (15%)
$0
Total repair estimate
$0

Carries this total, contingency included, into step 3.

Jump straight to the 70% rule calculator instead? It keeps its example numbers unless you run the steps.

Estimate only, not a contractor bid.

Nothing leaves your browser. Your numbers stay in this tab until you close it. Saved rates stay in this browser only.

FlipProperties is a PropStream affiliate partner. We may earn a commission if you sign up through our links, at no cost to you.

Lead paint in homes built before 1978

Under the EPA's Renovation, Repair and Painting rule, anyone paid to do work that disturbs paint in housing built before 1978 must be EPA-certified and follow lead-safe practices. Small jobs are exempt: 6 square feet or less per room inside and 20 square feet or less outside. Window replacement and demolition are always covered. Budget for a certified contractor if your flip is an older home.

What an underestimate costs you

Say a home's after-repair value is $300,000 and you estimate $40,000 in repairs. The 70% rule gives a maximum offer of $170,000. If repairs actually run $60,000, the maximum offer should have been $150,000, so you overpaid by $20,000 before any other costs.

That's why the estimate comes before the offer, not after. See a full fix-and-flip cost example.

Where PropStream fits

PropStream's Rehab Calculator estimates repair costs, including a do-it-yourself estimate, so you can rough out a number before you walk the property. Treat it as a starting point and confirm with your own walkthrough and bids.

Source: PropStream feature pages (checked October 2026). Plain text, not a link.

Run the numbers first.

Estimate repairs and comps in PropStream.

PropStream's 7-day trial includes 50 leads. Pull a property, rough out repairs with the Rehab Calculator, and check your offer against comps.

Start Your Free 7-Day Trial

Rehab cost questions

Walk the property with a checklist, price each item for materials and labor, get contractor bids on the big items, add permits, and add a contingency. Then subtract the total in your offer math.

There's no single rule, but HUD's 203(k) program requires 10% to 20% of repair costs on homes 30 years or older, and at least 15% if utilities aren't working. Older or vacant homes justify the higher end.

If the home was built before 1978 and paid work will disturb paint, EPA rules require a certified firm and lead-safe practices, with small-job exemptions. Check the EPA's rules before you start.

Often, for structural, electrical, plumbing and mechanical work. Requirements vary by city and county, so check with your local building department.

Directly. With the 70% rule, every dollar you add to repairs lowers your maximum offer by a dollar. A $20,000 underestimate means a $20,000 overpayment.